Moret-Loing-et-Orvanne (FR)

Building context

Office building

The French pilot is a 2-storey office building at EDF Lab Les Renardières in Moret-Loing-et-Orvanne. Built in 1965, it consists of two similar blocks divided by a central corridor, with a total area of 2,500 m² plus a basement covering the entire footprint of the building. The area has a temperate oceanic climate (Cfb).

The building served as a live testbed for BuildON. It needed better monitoring and control of its energy assets, improved indoor environmental quality (IEQ) and lower energy consumption, to be achieved through optimal management of the existing building rather than heavy renovation works.

 

Which upgrades were implemented?

BuildON deployed a new gateway and a set of measures to monitor and control energy assets and improve IEQ:

  • a “virtual” gateway, implemented with YODIWO and BuildON partners, complementing the hardware gateway (Wattsense) already in place and feeding the Universal API with the pilot’s real-time data;
  • indoor and outdoor sensors for air quality control;
  • LED units with dimmer switches;
  • a DAIKIN VRF system (a heat pump for space heating) and electricity consumption metering;
  • actuators accessed through the new gateway.

What did the pilot achieve?

Through BuildON, the building gained better monitoring and control of its energy assets and improved IEQ:

  • energy performance monitoring and management were enhanced;
  • new AI-based control features strengthened the cross-domain control of energy assets, optimised grid energy flexibility, and improved IEQ and visual comfort for users;
  • digital twins were generated to support energy performance simulation and operation;
  • energy consumption fell by 22%, mainly thanks to the heat pump.

How were end users involved?

Building occupants were involved in five steps to increase their understanding and acceptance of two BuildON services: the IEQ optimisation for comfort improvement tool and the digital twins for smart building operation.

First, 13 interviews and 32 questionnaires gathered the requirements for the BuildON IEQ service. They also informed an upgrade of the SMACH tool, which now simulates work-related activities in office buildings, such as personal work, formal and informal meetings, and breaks. An on-site co-design workshop then produced three service blueprints and 11 service prototypes, which were integrated into the IEQ service design process from January 2025.

An on-site and online information session showed occupants the equipment upgrades, control strategies, R&D studies and tool developments. A follow-up questionnaire on service use led developers to reorganise the data around users’ needs and improve the service. Finally, a hybrid training session with a live demo of the BuildON tools sparked participants’ interest in testing the solutions and exploring what the interface makes possible.

Lessons learned and next steps

Working with project partners, the pilot set up an IoT architecture based on the building’s existing devices and technologies, such as the gateway and sensors, adapting them where necessary. The BuildON API was then fed with real-time data from the building, allowing service developers to test and run their services.

Experience at the building shows that two steps are valuable before any development begins:

  • gathering end users’ needs and wishes;
  • understanding the building’s thermal behaviour, based on historical sensor datasets and, where possible, dynamic physical models.

Next steps for the digital twin tools and methodology developed in BuildON include further experimental validation and checking predictions against on-site measurements. Their replicability and scalability could be tested on other building types, both in dynamic simulation and in real-life pilots, with the health sector and multifamily housing as relevant candidates.